2026-09-26 ·
Modular Compounds for LNG and Gas Infrastructure Projects
LNG terminals, gas processing plants and associated infrastructure are typically multi-year builds, often located in remote or semi-industrial coastal areas where existing accommodation and office capacity is limited or non-existent.
Long-Duration Construction Camps
Given typical build durations, camps for these projects are usually specified for extended service life rather than short-term use, with administration buildings and modular site offices sized for a construction workforce that can run into the thousands at peak.
Coastal and Marine-Adjacent Siting
Many LNG projects sit on coastal or marine-adjacent sites, which brings in the same environmental considerations covered for coastal and marine environment modular buildings, alongside the project-specific facility mix.
Because these builds run for years, it's worth planning the compound's staged build-out against the construction schedule rather than specifying the whole camp for day one.